Field-first mobile

The PM tool that survives the jobsite.

Gloves on, phone slow, internet patchy. Built for the conditions field crews actually work in.

Platforms
iOS + Android

Real native apps

Touch targets
44pt minimum

Gloved-hand friendly

Offline
Full parity

Queue locally, sync on signal

Designed for hands that work

Big targets. Big text. No micro-buttons.

Every interactive element is at least 44 points with generous spacing. Primary actions in a thumb-zone strip at the bottom. The super doesn't pinch-zoom to tap things.

  • 44pt minimum touch target
  • Bottom thumb-zone for primary actions
  • Type that reads in direct sunlight

Offline-first

No signal? Keep working.

Voice commands, daily logs, photos, status changes. All queue locally and sync the moment you're back on signal. The app never grays out.

  • Local action queue with conflict resolution
  • Background sync when signal returns
  • Optimistic UI: action commits visually instantly

Photo capture in one tap

Tap. Shoot. Attached to the right task.

Open the camera from any task and the photo attaches automatically. Compressed on-device so it doesn't burn your data plan.

  • Photos attach to the right task
  • On-device compression
  • Per-project photo timeline

Real apps, not a wrapped website

Built for the phone. Feels like the phone.

Native iOS and Android. Gestures feel like the platform. Smooth even on a three-year-old phone.

  • Native gestures and conventions
  • Smooth on mid-tier hardware
  • Native push notifications

Without Buildficient

Super takes 11 photos in the iOS camera roll. At 7pm, tries to remember which photo went with which task. Two weeks later the client asks for the framing detail and nobody knows which photo it is.

With Buildficient

Super opens the framing task, taps the camera, takes one photo. Tagged automatically. Two weeks later the client asks and it's right there in the framing task's timeline.

Built especially for

Superintendents

The field app is for the super. Big buttons, voice-first, offline. Closes the day in the parking lot.

See the superintendents story

The PM tool that works where the work happens.

Not an office product crammed onto a screen.